In the construction of Namangan Square houses, Mesa tunnel formwork is used — this is a set of special equipment that is used for concrete tunnel bays and other structures based on them. Using formwork elements, borders can be set. Subsequently, this form is filled with concrete. After the solidification of the mass, the formwork is dismantled and a finished structure is obtained.
Benefits of this method:
— ability to complete all necessary construction work;
— guarantee of obtaining perfect accuracy;
— excellent quality of the finished structure;
— improving such characteristics as solidity, integrity, reliability.
Construction progress of Namangan Square residential complex
Period: 06/20/20 — 06/25/20
✔️ Laying of electrical and plumbing pipes in progress for block A03 first floor.
✔️ Rebar extension work for first floor in block A03.
✔️ Formwork for shear walls block A02.
✔️ Beton pouring for block A02 shear walls and platform work for tower crane.
✔️ Tunnel formwork installation in block A03 and beton pouring in block A02.
✔️ Electrical wiring pipes installation in the shear walls block A03 first floor.
✔️ Rebar extension work for the shear walls in block A01.
✔️ Formwork removal from the shear walls in Block A02.
✔️ Installation of tunnel formwork in Block A03 first floor.
✔️ Electrical pipes installation and rebar work for shear walls in block A03 first floor.
✔️ Leveling for retail area basement pit and excavation of lift pit.