In the construction of Namangan Square houses, Mesa tunnel formwork is used — this is a set of special equipment that is used for concrete tunnel bays and other structures based on them. Using formwork elements, borders can be set. Subsequently, this form is filled with concrete. After the solidification of the mass, the formwork is dismantled and a finished structure is obtained.

Benefits of this method:

— ability to complete all necessary construction work;
— guarantee of obtaining perfect accuracy;
— excellent quality of the finished structure;
— improving such characteristics as solidity, integrity, reliability.

Construction progress of Namangan Square residential complex
Period: 07/20/20 — 07/24/20

✔️ Rebar work and electric pipe installation on 2nd floor block A03
✔️ Installation of Coloms for 2nd floor of block A03
✔️ Beton pouring for first floor slab in block A03
✔️ A02 block slab rebar work
✔️ Tunnel formwork in block A03